Blocking is one of the most commonly overlooked components in drywall estimating, yet it has substantial cost and labor implications. Whether supporting millwork, casework, fixtures, or handrails, blocking adds layers of complexity that, if not properly captured, can throw off budgets and delay schedules. For architects, engineers, and general contractors, accurately accounting for blocking in wall assemblies is essential to maintaining project accuracy and constructability.
Blocking refers to pieces of wood, metal, or other support materials inserted between framing members to provide anchoring surfaces for mounted elements. It’s particularly common in commercial projects for items such as:
Though small in scope compared to the overall wall, blocking significantly impacts labor time, coordination across trades, and inspection readiness. When not properly estimated, it often results in costly rework and change orders in the field.
Estimators frequently rely on generic assumptions for blocking—e.g., a fixed percentage of wall area or linear feet of wall—which introduces risks when actual field conditions differ. Instead, a detailed approach can improve accuracy and reduce surprises.
With Active Estimating, estimators can tie blocking requirements to specific wall types or room functions, tracking them across iterations and adjusting as design progresses. By embedding blocking quantities directly into wall assemblies, estimates reflect both structural and finish needs simultaneously.
To avoid underestimating, consider implementing a structured blocking standard. Examples include:
Most importantly, use historical data and project type templates to calibrate assumptions based on real-world outcomes. Continuous tracking and feedback loops from the field provide essential insight for refining future estimates.
Rather than treating blocking as a separate scope, integrate it directly into your drywall estimating platform. This allows cost and material adjustments to flow automatically with design changes. When a wall type is swapped or added, blocking assumptions should update in parallel, preserving scope clarity without extra manual input.
Blocking may seem minor on paper, but its real-world impact is anything but. By proactively including detailed blocking assumptions in your estimating workflow, you enhance project clarity, reduce field risk, and build trust across the project team. Estimating is no longer about best guesses—it’s about building with intent, driven by data, and validated by past performance.