Active Estimating Identifies Potential Risks in Early Project Phases

Accurately identifying risk in the early phases of construction projects is pivotal to managing budgets, timelines, and client expectations. Through recent internal analysis and case reviews, Active Estimating has uncovered key risk indicators that emerge before subcontractor engagement, particularly during the budgeting and pre-bid stages. These findings emphasize the importance of early-stage visibility into labor metrics, scope clarity, and production feasibility.

Uncovering Scope Drift and Mismatched Assumptions

In-depth reviews of preconstruction documents have revealed how inconsistencies between budgetary assumptions and actual bid line item details can snowball into systemic project risk. One analysis demonstrated that a project initially scoped at 98,885 labor hours under budgeting parameters was ultimately bid at 123,035 labor hours — a 25% increase. This disconnect often stems from siloed estimating processes and a lack of dynamic labor unit benchmarking.

Key Indicators of Early Risk

Based on compiled project reviews and estimating trends, several recurring factors signal elevated early-phase risk:

  • Labor unit variance greater than 15% from historical benchmarks
  • Overreliance on unit averages without consideration for project-specific complexity
  • Manual entry or outdated spreadsheets driving takeoff assumptions
  • Delayed alignment between preconstruction and field operations teams

Data-Driven Intelligence in Risk Forecasting

Rather than relying solely on final bid reviews, Active Estimating leverages data-driven intelligence to analyze labor unit performance during the conceptual and schematic phases. This approach enables early identification of:

  • Scopes with productivity compression due to aggressive labor rates
  • Trades with misaligned scope coverage assumptions
  • Patterns of estimator overrides on risk-prone assemblies

For example, in the reviewed 425,000 sq. ft. scope, the budget allocated 27,500 labor hours to Exterior Framing. Upon bid finalization, that number escalated to 36,800 hours — a clear sign of underestimated risk factors such as weather exposure, sequencing inefficiencies, and material availability impacts.

Collaboration and Forecasting Alignment

Cross-departmental collaboration and real-time data review have proven vital in mitigating labor overruns. By comparing forecasted and actual labor hours at multiple design stages, estimating teams can apply rolling adjustments and improve bid accuracy. This iterative process enhances forecast integrity while reducing exposure to late-phase redesign costs or operational overruns.

Summary of Findings

  • Projects with >20% labor deviation from budget to bid should undergo additional review
  • Early alignment with operations teams helps detect hidden scope challenges
  • Benchmarking labor productivity across scopes reduces reliance on general assumptions
  • Transparent communication between estimation and operations narrows execution gaps

Conclusion

Proactive identification of labor variance and scope complexity indicators can significantly improve financial performance and stakeholder trust. By implementing refined labor metrics and phase-specific intelligence, firms can shift from reactive estimating to a predictive, controlled budgeting process.

For additional resources or to request a full whitepaper on this risk assessment methodology, contact the team below.

Contact Information

Active Estimating
508 2nd Street, Suite 208
Davis
California
95616

Rich Schoener
richard@activeestimating.com
(877) 982-2848
https://www.activeestimating.com/drywall-estimating-software

Original Source

https://www.activeestimating.com/media-room

Ready to Transform Your Estimating Process?

Schedule a personalized demo to see how Active Estimating can work for your specific needs.

AirTide Webflow template Image